Durable 10m to 20m(32ft to 65ft) Hand Free Nylon Dog Tracking/Training Lead Leash – Long Lead with Padded Handle…

£18.19

Leash is made of durable nylon with heavy-duty and equipped with stainless steel hook.
1″ width, 20m length.
The dog leash has a padded handle to protect users’ hands from rug burn.

In stock.

Description


Leash is made of durable nylon with heavy-duty and equipped with stainless steel hook.
1″ width, 10m length.
The dog leash has a padded handle to protect users’ hands from rug burn.
Available in blue and black color

Package include:
1x dog leash
1x belt
Leash is made of durable nylon with heavy-duty and equipped with stainless steel hook.
1″ width, 20m length.
The dog leash has a padded handle to protect users’ hands from rug burn.
With a belt for hand free. Easy to wear and remove, help you walk your dog easily.
Available in blue and black color

Product Binding

Product PackageQuantity

Product ProductGroup

Product ProductTypeName

Product Size

Product Brand

Product Label

Product Manufacturer

Product Publisher

Product Studio

Product Color

Product EAN

Product EANList

Product PackageDimensions

Reviews

There are no reviews yet.

Be the first to review “Durable 10m to 20m(32ft to 65ft) Hand Free Nylon Dog Tracking/Training Lead Leash – Long Lead with Padded Handle…”